Commit 5b68dbe5 authored by Erkka Rinne's avatar Erkka Rinne
Browse files

Added reference to the publication

Also removed some non-existent features from the description
parent 25758393
......@@ -26,12 +26,11 @@ Created by:
Ran Li
Ciara O'Dwyer
- Based on Stochastic Model Predictive Control method [1].
- Enables multiple different models (m) to be implemented by changing
the temporal structure of the model. (MULTI-MODEL RUNS TO BE IMPLEMENTED)
This is a GAMS implementation of the Backbone energy system modelling framework
[1]. Features include:
- Based on Stochastic Model Predictive Control method [2].
- Time steps (t) can vary in length.
- Short term forecast stochasticity (f) and longer term statistical uncertainty (s).
- Can handle ramp based dispatch in addition to energy blocks. (TO BE IMPLEMENTED)
GAMS command line arguments
......@@ -63,7 +62,10 @@ GAMS command line arguments
References
----------
[1] K. Nolde, M. Uhr, and M. Morari, Medium term scheduling of a hydro-thermal
[1] N. Helist et al., Backbone---An Adaptable Energy Systems Modelling Framework,
Energies, vol. 12, no. 17, p. 3388, Sep. 2019. Available at:
https://dx.doi.org/10.3390/en12173388.
[2] K. Nolde, M. Uhr, and M. Morari, Medium term scheduling of a hydro-thermal
system using stochastic model predictive control, Automatica, vol. 44,
no. 6, pp. 15851594, Jun. 2008.
......
Markdown is supported
0% or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment