Commit 95ac60f0 authored by Niina Helistö's avatar Niina Helistö
Browse files

Updates to results outputting.

Also some updates to 4d_postProcess_invest2schedule_temp.gms but using that for invest-schedule linking still doesn't really work with the dynamic generation portfolios.
parent b6030656
......@@ -13,15 +13,15 @@ loop(unit,
);
* Update the number of subunits in the child setups (rounded here to the nearest integer)
loop(unit${r_invest(unit)},
tmp = round(r_invest(unit), 0)
loop(unit${sum(t_invest, r_invest(unit, t_invest))},
tmp = round(sum(t_invest, r_invest(unit, t_invest)), 0)
put "p_unit('", unit.tl, "', 'unitCount') = p_unit('", unit.tl, "', 'unitCount') + ", tmp, ";"/;
);
* Update maxGen and maxCons values in the child setups
loop(gnu(grid, node, unit)${r_invest(unit)},
tmp = round(r_invest(unit), 0) * p_gnu(grid, node, unit, 'unitSizeGen');
tmp = round(sum(t_invest, r_invest(unit, t_invest)), 0) * p_gnu(grid, node, unit, 'unitSizeGen');
put "p_gnu('", grid.tl, "', '", node.tl, "', '", unit.tl, "', 'maxGen') = p_gnu('", grid.tl, "', '", node.tl, "', '", unit.tl, "', 'maxGen') + ", tmp, ";"/;
tmp = round(r_invest(unit), 0) * p_gnu(grid, node, unit, 'unitSizeCons');
tmp = round(sum(t_invest, r_invest(unit, t_invest)), 0) * p_gnu(grid, node, unit, 'unitSizeCons');
put "p_gnu('", grid.tl, "', '", node.tl, "', '", unit.tl, "', 'maxCons') = p_gnu('", grid.tl, "', '", node.tl, "', '", unit.tl, "', 'maxCons') + ", tmp, ";"/;
);
......
......@@ -55,6 +55,12 @@ Parameters
r_totalRealizedOperatingCost "Total realized system operating costs over the simulation (MEUR)" / 0 /
r_totalRealizedNetOperatingCost "Total realized system operating costs over the simulation (MEUR)" / 0 /
// Realized System Fixed Costs
r_gnTotalRealizedFixedCost(grid, node) "Total realized system fixed costs in gn over the simulation (MEUR)"
r_gnTotalRealizedFixedCostShare(grid, node) "Total realized system fixed cost gn/g shares over the simulation"
r_gTotalRealizedFixedCost(grid) "Total realized system fixed costs in g over the simulation (MEUR)"
r_totalRealizedFixedCost "Total realized system fixed costs over the simulation (MEUR)" / 0 /
// Realized System Costs
r_gnTotalRealizedCost(grid, node) "Total realized system costs in gn over the simulation (MEUR)"
r_gnTotalRealizedCostShare(grid, node) "Total realized system cost gn/g shares over the simulation"
......
......@@ -130,11 +130,11 @@ q_obj ..
) // END sum(gnuft_rampCost)
] // END * p_sft_probability(s,f,t)
// Discount costs
* p_discountFactor(s)
* p_discountFactor(s) // Discount costs
) // END sum over msft(m, s, f, t)
// Cost of energy storage change
// Cost of energy storage change (note: not discounted)
+ sum(gn_state(grid, node),
+ sum(mft_start(m, f, t)${ p_storageValue(grid, node, t)
and active(m, 'storageValue')
......@@ -196,10 +196,9 @@ q_obj ..
] // END * v_investTransfer_MIP
) // END sum(gn2n_directional)
) // END sum(t_invest)
// Sample weighting to calculate annual costs
* p_msAnnuityWeight(m, s)
// Discount costs
* p_discountFactor(s)
* p_msAnnuityWeight(m, s) // Sample weighting to calculate annual costs
* p_discountFactor(s) // Discount costs
) // END sum(ms)
$ifthen.addterms exist '%input_dir%/2c_additional_objective_terms.gms'
......
......@@ -90,59 +90,77 @@ loop(m,
) // END sum(ft_realizedNoReset)
]; // END * 1e-6
* --- Total Cost Components ---------------------------------------------------
* --- Total Cost Components (discounted) --------------------------------------
// Total VOM costs
r_gnuTotalVOMCost(gnu_output(grid, node, unit))
= sum(ft_realizedNoReset(f,t)$[ord(t) > mSettings(m, 't_start') + mSettings(m, 't_initializationPeriod')],
+ r_gnuVOMCost(grid, node, unit, f, t)
* sum(msft_realizedNoReset(m, s, f, t), p_msProbability(m, s) * p_msWeight(m, s))
* sum(msft_realizedNoReset(m, s, f, t), p_msProbability(m, s) * p_msWeight(m, s) * p_discountFactor(s))
);
// Total fuel & emission costs
r_uTotalFuelEmissionCost(fuel, unit)${ uFuel(unit, 'main', fuel) }
= sum(ft_realizedNoReset(f,t)$[ord(t) > mSettings(m, 't_start') + mSettings(m, 't_initializationPeriod')],
+ r_uFuelEmissionCost(fuel, unit, f, t)
* sum(msft_realizedNoReset(m, s, f, t), p_msProbability(m, s) * p_msWeight(m, s))
* sum(msft_realizedNoReset(m, s, f, t), p_msProbability(m, s) * p_msWeight(m, s) * p_discountFactor(s))
);
// Total unit startup costs
r_uTotalStartupCost(unit)${ sum(starttype, unitStarttype(unit, starttype)) }
= sum(ft_realizedNoReset(f,t)$[ord(t) > mSettings(m, 't_start') + mSettings(m, 't_initializationPeriod')],
+ r_uStartupCost(unit, f, t)
* sum(msft_realizedNoReset(m, s, f, t), p_msProbability(m, s) * p_msWeight(m, s))
* sum(msft_realizedNoReset(m, s, f, t), p_msProbability(m, s) * p_msWeight(m, s) * p_discountFactor(s))
);
// Total state variable slack costs
r_gnTotalStateSlackCost(gn_stateSlack(grid, node))
= sum(ft_realizedNoReset(f,t)$[ord(t) > mSettings(m, 't_start') + mSettings(m, 't_initializationPeriod')],
+ r_gnStateSlackCost(grid, node, f, t)
* sum(msft_realizedNoReset(m, s, f, t), p_msProbability(m, s) * p_msWeight(m, s))
* sum(msft_realizedNoReset(m, s, f, t), p_msProbability(m, s) * p_msWeight(m, s) * p_discountFactor(s))
);
// Fixed O&M costs
r_gnuFOMCost(gnu(grid, node, unit))
= 1e-6 // Scaling to MEUR
* [
+ p_gnu(grid, node, unit, 'maxGen') // Not in v_obj
+ p_gnu(grid, node, unit, 'maxCons') // Not in v_obj
+ sum(t_invest, r_invest(unit, t_invest))
* p_gnu(grid, node, unit, 'unitSizeTot')
]
* sum(ms(m, s)${ sum(msft_realizedNoReset(m, s, f, t_), 1) }, // consider ms only if it has active msft_realizedNoReset
+ [
+ p_gnu(grid, node, unit, 'maxGen')$sum(msft_realizedNoReset(m, s, f, t_), uft(unit, f, t_)) // Not in v_obj; only units active in msft_realizedNoReset
+ p_gnu(grid, node, unit, 'maxCons')$sum(msft_realizedNoReset(m, s, f, t_), uft(unit, f, t_)) // Not in v_obj; only units active in msft_realizedNoReset
+ sum(t_invest(t)${ord(t) <= msEnd(m, s)},
+ r_invest(unit, t)$sum(msft_realizedNoReset(m, s, f, t_), uft(unit, f, t_)) // only units active in msft_realizedNoReset
)
* p_gnu(grid, node, unit, 'unitSizeTot')
]
* p_msAnnuityWeight(m, s) // Sample weighting to calculate annual costs
* p_discountFactor(s) // Discount costs
) // END * sum(ms)
* p_gnu(grid, node, unit, 'fomCosts');
// Unit investment costs
r_gnuUnitInvestmentCost(gnu(grid, node, unit))
= 1e-6 // Scaling to MEUR
* sum(t_invest, r_invest(unit, t_invest))
* sum(ms(m, s)${ sum(msft_realizedNoReset(m, s, f, t_), 1) }, // consider ms only if it has active msft_realizedNoReset
+ sum(t_invest(t)${ord(t) <= msEnd(m, s)},
+ r_invest(unit, t)$sum(msft_realizedNoReset(m, s, f, t_), uft(unit, f, t_)) // only units active in msft_realizedNoReset
)
* p_msAnnuityWeight(m, s) // Sample weighting to calculate annual costs
* p_discountFactor(s) // Discount costs
) // END * sum(ms)
* p_gnu(grid, node, unit, 'unitSizeTot')
* p_gnu(grid, node, unit, 'invCosts')
* p_gnu(grid, node, unit, 'annuity');
// Transfer link investment costs
r_gnnLinkInvestmentCost(grid, from_node, to_node)
r_gnnLinkInvestmentCost(gn2n_directional(grid, from_node, to_node)) // gn2n_directional only, as in q_obj
= 1e-6 // Scaling to MEUR
* sum(t_invest, r_investTransfer(grid, from_node, to_node, t_invest))
* sum(ms(m, s)${ sum(msft_realizedNoReset(m, s, f, t_), 1) }, // consider ms only if it has active msft_realizedNoReset
+ sum(t_invest(t)${ord(t) <= msEnd(m, s)}, // only if investment was made before or during the sample
+ r_investTransfer(grid, from_node, to_node, t)
)
* p_msAnnuityWeight(m, s) // Sample weighting to calculate annual costs
* p_discountFactor(s) // Discount costs
) // END * sum(ms)
* [
+ p_gnn(grid, from_node, to_node, 'invCost')
* p_gnn(grid, from_node, to_node, 'annuity')
......@@ -373,13 +391,13 @@ r_gnTotalSpillShare(gn(grid, node_spill))${ r_gTotalSpill(grid) > 0 }
= r_gnTotalSpill(grid, node_spill)
/ r_gTotalSpill(grid);
* --- Total Costs Results -----------------------------------------------------
* --- Total Costs Results (discounted) ----------------------------------------
// Total realized operating costs on each gn over the simulation
r_gnTotalRealizedOperatingCost(gn(grid, node))
= sum(ft_realizedNoReset(f, t)$[ord(t) > mSettings(m, 't_start') + mSettings(m, 't_initializationPeriod')],
+ r_gnRealizedOperatingCost(grid, node, f ,t)
* sum(msft_realizedNoReset(m, s, f, t), p_msProbability(m, s) * p_msWeight(m, s))
* sum(msft_realizedNoReset(m, s, f, t), p_msProbability(m, s) * p_msWeight(m, s) * p_discountFactor(s))
);
// Total realized net operating costs on each gn over the simulation
......@@ -416,11 +434,11 @@ r_gnTotalRealizedCost(gn(grid, node))
)
+ sum(gn2n_directional(grid, from_node, node),
+ r_gnnLinkInvestmentCost(grid, from_node, node)
/ 2
/ 2 // Half of the link costs are allocated to the receiving end
)
+ sum(gn2n_directional(grid, node, to_node),
+ r_gnnLinkInvestmentCost(grid, node, to_node)
/ 2
/ 2 // Half of the link costs are allocated to the sending end
);
// Total realized net costs on each gn over the simulation
......@@ -448,6 +466,26 @@ r_totalRealizedCost
r_totalRealizedNetCost
= sum(gn(grid, node), r_gnTotalRealizedNetCost(grid, node));
// Total realized fixed costs on each gn over the simulation
r_gnTotalRealizedFixedCost(gn(grid, node))
= r_gnTotalRealizedCost(grid, node)
- r_gnTotalRealizedOperatingCost(grid, node);
// Total realized fixed costs on each grid over the simulation
r_gTotalRealizedFixedCost(grid)
= r_gTotalRealizedCost(grid)
- r_gTotalRealizedOperatingCost(grid);
// Total realized fixed costs gn/g share
r_gnTotalRealizedFixedCostShare(gn(grid, node))${ r_gTotalRealizedFixedCost(grid) > 0 }
= r_gnTotalRealizedFixedCost(grid, node)
/ r_gTotalRealizedFixedCost(grid);
// Total realized fixed costs over the simulation
r_totalRealizedFixedCost
= r_totalRealizedCost
- r_totalRealizedOperatingCost;
* --- Reserve Provision Overlap Results ---------------------------------------
// Calculate the overlapping reserve provisions
......
Supports Markdown