1. 23 Oct, 2019 1 commit
    • Erkka Rinne's avatar
      Use scenarios with positive probability · ec74d221
      Erkka Rinne authored
      Only use scenarios with positive probability in building the long-term
      stochastic tree. Previously this was limited to the number of scenarios,
      but this allows excluding a scenario (setting its prob. to zero).
      
      (cherry picked from commit 333f6020)
      ec74d221
  2. 27 Sep, 2019 2 commits
  3. 11 Sep, 2019 1 commit
  4. 10 Jul, 2019 1 commit
  5. 13 Jun, 2019 1 commit
  6. 11 Apr, 2019 1 commit
  7. 04 Apr, 2019 4 commits
  8. 03 Apr, 2019 8 commits
  9. 29 Mar, 2019 1 commit
  10. 28 Mar, 2019 2 commits
  11. 27 Mar, 2019 4 commits
  12. 22 Mar, 2019 1 commit
  13. 18 Mar, 2019 1 commit
  14. 11 Mar, 2019 1 commit
  15. 04 Mar, 2019 2 commits
    • Niina Helistö's avatar
      Making it possible to choose in the modelsInit.gms file whether to include the... · 83dc0fda
      Niina Helistö authored
      Making it possible to choose in the modelsInit.gms file whether to include the two additional incremental heat rate equations that use binary variables:
      - mSettings(m, 'incHRAdditionalConstraints') = 0: use the constraints but only for units with non-convex fuel use
      - mSettings(m, 'incHRAdditionalConstraints') = 1: use the constraints for all units represented using incremental heat rates
      Enabling incremental heat rates also in the invest model (and potentially in the building model). Some clean-up to the incremental heat rate equations.
      83dc0fda
    • Erkka Rinne's avatar
      New parameter `df_scenario` for forecast displacement in long-term scenarios · 74a39217
      Erkka Rinne authored
      Long-term scenarios should use realized (`f00`) data but time structure in the scenario period uses central forecast (`f02`).
      74a39217
  16. 26 Feb, 2019 4 commits
  17. 21 Feb, 2019 1 commit
  18. 12 Feb, 2019 1 commit
  19. 04 Feb, 2019 1 commit
  20. 01 Feb, 2019 2 commits